SAE Mass Delta at WPI is extensively renovating its historic chapter house at 6 Humboldt Avenue, which has been home to the fraternity for over 100 years.  The project is made possible thanks to the generosity of over 200 donors who have contributed over $700,000 to Building Our Future - The Campaign for Mass Delta.

Summer 2016 - Dining Room and Foyer Renovation

The first phase of the project  is being completed by Antonelli Construction, a Worcester-based general contractor.  Work commenced in July, and the scope includes installation of tile (dining room) and hardwood (foyer) floors, electric and heating upgrades, refurbishment of the staircase and fireplace, removal of the vestibule, and new walls and ceilings installed over the existing.

Structurally, an additional opening will be created between the foyer and dining room to create a more continuous space.

August 2016 Construction Photos

September 2016 Construction Photos

Final Renovation Photos